Contact Us
Phone:
Phone:
Email:
Address:
No. 11 Xingliu Road, Carbon and Steel Deep-processing Industrial Park, Liaoyang County, Liaoning Province
Bulk storage of high-power graphite electrodes
- Product Description
-
Physicochemical specifications of graphite electrodes:
Project
Unit
Normal power
High power
Ultra-high power
≤φ400
≥φ450
≤φ400
≥φ450
≤φ500
≥φ550
Resistivity
Electrode
μΩm
7.0-8.5
7.5-9.0
5.2-6.3
5.3-6.3
4.5-5.8
4.5-5.8
Joint
4.2-5.2
3.5-4.5
3.0-4.0
Flexural strength
Electrode
Mpa
7.5-9.5
7.0-8.5
10.5-15
10.5-15
12.0–17.0
11.0–16.0
Joint
17.0-22.0
20.0-26.0
21.0-28.0
24.0-30.0
Elastic modulus
Electrode
GPA
6.0-9.0
9.0-12.0
9.0-12.0
Joint
12.0–16.0
13.0-18.0
15.0-20.0
Ash content
Electrode
%
0.4
0.2
0.2
Joint
Bulk density
Electrode
g/cm³
1.54-1.62
1.66-1.73
1.66-1.74
1.68-1.74
Joint
1.72-1.77
1.77-1.82
1.80-1.85
Coefficient of thermal expansion (100–600°C)
Electrode
10-6/°C
2.0-2.4
1.6-1.8
1.1-1.5
Joint
1.5-2.0
1.3-1.5
0.9-1.2
Graphite electrode specifications and permissible deviations:
Nominal diameter
Actual diameter (mm)
Actual Length (mm)
Mm
in
Maximum
Minimum
The black skin portion is the smallest.
Length
Permissible deviation in length
Short尺 length
200
8
205
200
197
1600/1800
250
10
256
251
248
1600/1800
300
12
307
302
299
1600/1800
350
14
357
352
349
1600/1800
400
16
409
403
400
1800/2000/2200
±100
-275
450
18
460
454
451
1800/2000/2200
500
20
511
505
502
1800/2000/2200/2400
550
22
562
556
553
2000/2200/2400
600
24
613
607
604
2000/2200/2400/2700
650
26
663
657
654
2400/2700
700
28
714
708
705
2400/2700
750
30
765
761
758
2200/2400/2700/3000
800
32
816
812
809
2200/2400/2700/3000
Thread Size Chart:
Nominal diameter
IEC
Joint dimensions (mm)
Connector hole size (mm)
Pitch
Code
mm
in
D Deviation (-0.5–0)
L Deviation (-1-0)
D2 Deviation (-5–0)
I
D1 Deviation (0–0.5)
H Deviation (0–7)
mm
200
8
122T4N
122.24
177.8
80
<7
115.92
94.9
6.35
250
10
152T4N
152.4
190.5
108
146.08
101.3
300
12
177T4N
177.8
215.9
129.2
171.48
114
350
14
203T4N
203.2
254
148.2
196.88
133
400
16
222T4N
222.25
304.8
158.8
215.93
158.4
400
16
222T4L
222.25
355.6
150
215.93
183.8
450
18
241T4N
241.3
304.8
177.9
234.98
158.4
450
18
241T4L
241.3
355.6
169.42
234.98
183.8
500
20
269T4N
269.88
355.6
198
263.56
183.8
500
20
269T4L
269.88
457.2
181.08
263.56
234.6
550
22
298T4N
298.45
355.6
226.58
292.13
183.8
550
22
298T4L
298.45
457.2
209.65
292.13
234.6
600
24
317T4N
317.5
355.6
245.63
311.18
183.8
600
24
317T4L
317.5
457.2
228.7
311.18
234.6
650
26
355T4N
255.6
457.2
266.79
349.28
234.6
650
26
355T4L
355.6
558.8
249.86
349.28
285.4
700
28
374T4N
374.65
457.2
285.84
368.33
234.6
700
28
374T4L
374.65
558.8
268.91
368.33
285.4
750
30
406T4N
406.4
584.2
296.42
400.08
298.1
750
30
406T4L
406.4
609.6
292.19
400.08
310.8
800
32
431T4N
431.8
635
313.36
425.48
323.5
800
32
431T4L
431.8
685.8
304.89
425.48
348.9
250
10
155T3N
155.57
220
103.8
<10
147.14
116
8.47
300
12
177T3N
177.16
270.9
116.9
168.73
141.5
350
14
215T3N
215.9
304.8
150
207.47
158.4
400
16
241T3N
241.3
338.7
169.8
232.87
175.3
450
18
273T3N
273.05
355.6
198.7
264.62
183.8
500
20
298T3N
298.45
372.6
221.3
290.02
192.2
550
22
298T3N
298.45
372.6
221.3
290.02
192.20
Graphite Electrode Recommended Current Load Table:
Nominal diameter
Permissible current load
Standard‑power graphite electrode
High-power graphite electrode
Ultra-high-power graphite electrode
mm
A
A/C m³
A
A/C m³
A
A/C m³
200
5000-6900
15-21
5,500–9,000
18-25
250
7,000–10,000
14-20
8000-13000
18-25
300
10,000–13,000
14-18
13,000–17,400
17-24
15,000–22,000
20-30
350
13,500–18,000
14-18
17,400–24,000
17-24
20,000–30,000
20-30
400
18,000–23,500
14-18
21,000–31,000
16-24
25,000–40,000
19-30
450
22,000–27,000
13-17
25,000–40,000
15-24
32,000–45,000
19-27
500
25,000–32,000
13-16
30,000-48,000
15-24
38,000–55,000
18-27
550
28,000–34,000
13-16
34,000–53,000
14-22
45,000–65,000
18-27
600
30,000–36,000
11–13
38,000–58,000
13-21
50,000–75,000
18-26
650
32,000–39,000
10–12
41,000–65,000
12--20
60,000–85,000
18-25
700
34,000–42,000
9–11
45,000–72,000
12–19
70,000–120,000
18-30
SEO:
Previous item
Precautions for Use
1. Graphite electrodes shall be covered with rain tarpaulins during transportation.
2. Handle and lift electrodes carefully by forklift to avoid collision. Stack only one layer at a time, keep balance and alignment to prevent falling or breakage.
3. Steel wire ropes must be used for crane loading and unloading. Do not lift the steel bands on electrodes directly.
4. Electrodes shall be stored in a clean and dry place. The stacking height shall not exceed four layers. If stacked outdoors in rainy weather, cover them with waterproof tarpaulins.
5. Moist electrodes shall be dried in a drying furnace before use. The temperature shall not exceed 150°C, and the drying time shall be no less than 24 hours.
6. Use special tools to cut steel bands when using electrodes. Do not use a crane for this operation to prevent accidents.
7. Blow clean the electrode end faces and nipple holes before connection. Screw the nipple into one end of the electrode and the lifting nipple into the other end. Do not place the nipple directly on the working electrode in the furnace.
8. Do not use steel wool, metal brushes or abrasive cloth to clean electrode threads. Oil-free and water-free compressed air may be used when necessary.
9. When lifting with an electrode lifting tool, place soft pads at the electrode nipple joint to avoid thread damage.
10. Lift the electrode above the furnace with a lifter equipped with a spiral hook, align it with the center of the nipple hole, lower it slowly, and tighten it into place with the torque ring.
11. Tighten the electrodes with a torque wrench at the proper torque to ensure no obvious gap at the joint between two electrodes.
12. Excessive or insufficient torque will cause adverse effects. Apply torque strictly in accordance with the specified value.
13. The electrode holder must be positioned between the two white safety lines. The contact surface between the holder and electrode shall be cleaned regularly to maintain good contact. The cooling water jacket of the holder shall be fastened tightly to prevent water leakage.
14. Insulating materials shall not be charged into the furnace to avoid electrode breakage. The operating current of the electrode must comply with its allowable current load.
15. When charging scrap steel, place small pieces on top of large pieces to prevent material collapse and electrode breakage.
Production capacity
Frequently Asked Questions
What are the precautions for use?
1. Graphite electrodes shall be covered with rain tarpaulins during transportation. 2. Handle and lift electrodes carefully by forklift to avoid collision. Stack only one layer at a time, keep balance and alignment to prevent falling or breakage. 3. Steel wire ropes must be used for crane loading and unloading. Do not lift the steel bands on electrodes directly. 4. Electrodes shall be stored in a clean and dry place. The stacking height shall not exceed four layers. If stacked outdoors in rainy weather, cover them with waterproof tarpaulins. 5. Moist electrodes shall be dried in a drying furnace before use. The temperature shall not exceed 150°C, and the drying time shall be no less than 24 hours. 6. Use special tools to cut steel bands when using electrodes. Do not use a crane for this operation to prevent accidents. 7. Blow clean the electrode end faces and nipple holes before connection. Screw the nipple into one end of the electrode and the lifting nipple into the other end. Do not place the nipple directly on the working electrode in the furnace. 8. Do not use steel wool, metal brushes or abrasive cloth to clean electrode threads. Oil-free and water-free compressed air may be used when necessary. 9. When lifting with an electrode lifting tool, place soft pads at the electrode nipple joint to avoid thread damage. 10. Lift the electrode above the furnace with a lifter equipped with a spiral hook, align it with the center of the nipple hole, lower it slowly, and tighten it into place with the torque ring. 11. Tighten the electrodes with a torque wrench at the proper torque to ensure no obvious gap at the joint between two electrodes. 12. Excessive or insufficient torque will cause adverse effects. Apply torque strictly in accordance with the specified value. 13. The electrode holder must be positioned between the two white safety lines. The contact surface between the holder and electrode shall be cleaned regularly to maintain good contact. The cooling water jacket of the holder shall be fastened tightly to prevent water leakage. 14. Insulating materials shall not be charged into the furnace to avoid electrode breakage. The operating current of the electrode must comply with its allowable current load. 15. When charging scrap steel, place small pieces on top of large pieces to prevent material collapse and electrode breakage.
What is the level of hardware and production equipment at Liaoning Hongda New Materials Technology Co., Ltd.?
The company is equipped with industry‑leading production facilities, including 24 counterflow calcination furnaces, a 4,100‑ton vertical‑ram horizontal extrusion press, multiple hydraulic presses, a rotary roasting furnace, a tunnel kiln, an internal‑series graphitization furnace, and five CNC‑automated production lines for electrodes and connectors, all supported by advanced information‑based production management to ensure consistent product quality.
What are the geographical advantages of Liaoning Hongda New Materials Technology Co., Ltd.?
The company is located in Liaoyang, Liaoning Province—a central chemical hub in southern Liaoning—bordering Anshan to the south and adjacent to the Liaohe Oilfield to the west. It lies 260 kilometers from Dalian Port and 600 kilometers from Tianjin Port, enjoying favorable transportation links and a strategic industrial location.
What products does Liaoning Hongda New Materials Technology Co., Ltd. primarily manufacture?
The company specializes in graphite electrodes of various specifications, offering products ranging from Φ200 to Φ700 mm—standard‑power graphite electrodes, impregnated (high‑density) graphite electrodes, high‑power graphite electrodes, and ultra‑high‑power graphite electrodes. Annual production capacity reaches 50,000 metric tons.
Related products
Contact Us
Phone:+86 419 5765111
Phone:+86 15102465333 General Manager Ge
+86 13941925958 Ms. Yang
Email:XS@lnhddt.cn
Address: No. 11 Xingliu Road, Carbon and Steel Deep-Processing Industrial Park, Liaoyang County, Liaoyang City, Liaoning Province
Smart Customer Service
0Sorry, there is currently no content in this section.
You can view other sections.
Business license